It's a relatively simple installation, given that the Modpool arrives fully built with a ready-to-go mechanical room. Our model is built to accommodate a previously unfamiliar installer easily, as 95% of Modpool installations are done by a first-timer.
Here are the four main areas you or a contractor you hire is covering:
- Permitting
- land prep (level footing of compacted gravel or concrete slab)
- crane/forklift offloading
- running electrical
- connecting gas line
- any additional landscaping (decking, stairs, garden and more)